9. Cut roofing membrane stripes (G)
to size so that they overlap the
already laid roofing membrane by
at least 10 mm.
Fig. 60: Cutting roofing membrane
stripes to size
10. Apply roofing membrane strip (G).
Fig. 61: Applying roofing membrane
stripes
11. Apply solvent-welding agent with
a flat brush between the roofing
membrane strip (G) and the
already laid roofing membrane as
follows:
In short sections of approx. 50 to
100 cm in length in the direction
of laying
Approx. 5 to 10 cm wide at drip
edges (D) and drip edge overlap
pieces (F) over the complete
support point of the roofing
membrane strip (G)
Fig. 62: Apply solvent-welding agent in
sections
Fig. 63: Applying solvent-welding agent