Unit assembly
44 © robatherm
12. Press on roofing membrane strip
(G) with a roller or the palm of
your hand.
Fig. 64: Pressing
13. Weigh down the roofing
membrane strip (G) with a sand
bag.
Fig. 65: Weighing down
Repeat work steps 11 to 13 for the next section of the roofing membrane strip (G)
of 50 to 100 cm in length.
14. Press a thin strand of the sealing
paste of the roofing membrane
steadily into the joint edge.
Sealing paste of the roofing membrane
dries quickly to a dense film.
Fig. 66: Sealing paste
Roofing is closed at the separation
point (C).
Fig. 67: Roof sealing at the separation
point