EasyManua.ls Logo

robatherm RM - Page 45

Default Icon
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Unit assembly
© robatherm 45
Workflow at the corners
1. Dismantle transport lugs (B) and
screws.
Fig. 68: Disassembling transport lug
2. Close holes from above with plugs
(gray) or plugs (gray), depending
on casing construction.
3. Close holes from below with plugs
(white), depending on casing
construction.
Fig. 69: Close hole
Roofing membranes must be clean.
4. Clean soiled roofing membranes
with a damp cloth.
Fig. 70: Cleaning
Roofing membranes must be dry.
5. Dry wet roofing membranes with
hot air.
Fig. 71: Drying

Related product manuals