102 Operating Instructions Cubis
®
MCA
Decommissioning
11 Decommissioning
11.1 Decommissioning the Device
Procedure
t Turn the device off.
t Disconnect the device from the power supply.
t Disconnect the device from all connected devices and all accessories,
e.g. printer or electronics module.
t If this relates to a device with an analytical draft shield or flat glass draft
shield: Remove the draft shield side panels and upper panel
(seeChapter “9.1 Preparing a Device with an Analytical Draft Shield or
Flat Glass Draft Shield”, page 96).
t Clean the device (see Chapter 9.3, page 97).
t Re-insert all components into the device (see Chapter “5.7 Installing a
Device with an Analytical Draft Shield or Flat Glass Draft Shield”,
page 48, Chapter “5.8 Installing a Device with a Frame Draft Shield”,
page 50).
t If below-balance weighing has been set up:
t Turn the device on its side and place it on a soft support base.
t Remove the hook for below-balance weighing from the thread.
t Insert the hook for below-balance weighing (2) into its retainer on
theunderside of the weighing module.
t Re-insert the cover of the below-balance weighing equipment (1).
t Place the device on the device base on a level surface.
12 Transport
12.1 Transporting the Device
Procedure
t
CAUTION
Risk of injury from breaking glass Glass components can
break if they fall or are handled incorrectly. Glass fragments can cause cuts.
t Only lift the device by its base, not by the draft shield.
t When lifting and transporting, ensure that no personnel or objects are
inthe way.
t Use suitable conveyance devices, e.g., trolleys, for long transport routes.
2
1