16
SCClub operating instructions
Safety
1.3 Conditions for use and
installation
Risk of burning/Risk of injury
> The conditions for installation
and use must be observed.
> The conditions for installation
and use specied in the
Technical data chapter must be
observed.
Preparatory structural work for the electrical
connection, the water connection and
the waste water connection must be
commissioned by the operator of the
machine. It must be carried out by licensed
installers observing all general, national
as well as locally applicable regulations.
Schaerer Service may only connect the
coee machine to the prepared connections.
They are neither authorised to carry
out structural installation, nor are they
responsible for its implementation.
WARNING
Technical data
w page 108