49
S100-F / ITB-F I&O Manual
IM101230
RD: JAN 2014
RL: 9A
S100 / ITB 110-50 not required
S100 / ITB 130-30 14' (4.3 m)
S100 / ITB 130-40 10' (3 m)
S100 / ITB 130-50 not required
S100 / ITB 155-40 * 2' (0.6 m)
S100 / ITB 155-50 * 2’ (0.6 m)
S100 / ITB 155-60 not required
S100 / ITB 175-70 10’ (3 m)
S100 / ITB 200-50 10’ (3 m)
S100 / ITB 175-50/60 10’ (3 m)
-
VENT END - FACTORY INSTALLED IN TUBE
VENT END - FACTORY INSTALLED IN TUBE
-
FIELD INSTALLED AT END 3RD TUBE
FIELD INSTALLED AT VENT END
-
VENT END - FACTORY INSTALLED IN TUBE
VENT END - FACTORY INSTALLED IN TUBE
VENT END - FACTORY INSTALLED IN TUBE
NG or LP
NG or LP
NG or LP
NG or LP
NG or LP
NG or LP
NG or LP
NG or LP
NG Only
NG Only
NG or LP S100 / ITB 200-60/70 10’ (3 m)
6th tube = 50 TO 60 ft
+ 10' (3 m)
VENT END - FACTORY INSTALLED IN TUBE
GAS
TYPE
MODEL
TURBULATOR
LENGTH
TURBULATOR LOCATION
IN TUBE SYSTEM
NG or LP S100 / ITB 45-20 14' (4.3 m)
VENT END - FACTORY INSTALLED IN TUBE
NG or LP S100 / ITB 60-20 14' (4.3 m)
VENT END - FACTORY INSTALLED IN TUBE
NG or LP S100 / ITB 60-30 14' (4.3 m)
VENT END - FACTORY INSTALLED IN TUBE
NG or LP S100 / ITB 80-20 14' (4.3 m)
VENT END - FACTORY INSTALLED IN TUBE
NG or LP S100 / ITB 80-30 14' (4.3 m)
VENT END - FACTORY INSTALLED IN TUBE
NG or LP S100 / ITB 80-40 10’ (3 m)
VENT END - FACTORY INSTALLED IN TUBE
NG ONLY S100 / ITB 100-20 8’ (2.4 m) S/S
VENT END - FACTORY INSTALLED IN TUBE
NG or LP S100 / ITB 110-30 14' (4.3 m)
VENT END - FACTORY INSTALLED IN TUBE
NG or LP S100 / ITB 110-40 10' (3 m)
VENT END - FACTORY INSTALLED IN TUBE
NOTE: Improper location of a turbulator can cause malfunction of the heater,
property damage, and will void the heater warranty.
Tube Kits are supplied with 4 ft & 10 ft turbulator(s) factory installed into the
tube(s). Tubes with turbulators are clearly labeled for easy identification. Two
models require that a 2 ft turbulator be installed in the field (see * below).
25A. TURBULATOR LENGTH & LOCATION IN SYSTEM: S100 / ITB - Straight Tube
* 155 Models (150,000 Btuh): 2 ft turbulator is supplied in the Burner Kit and is field installed:
40 ft heater: Insert in end of third tube, prior to the 10 ft turbulator that is factory installed
in the last tube (total 12 ft turbulator)
50 ft heater: Insert in the vent end of the last tube in the system.