ST94-21 C/Ku-Band TVRO Installation
3. The person inside now loosely
installs the rest of the
hardware in all of the flanges.
Do NOT tighten the bolts at
this time.
NOTE: The person who is working
inside installing hardware, applying
Loctite, tightening hardware and
cleaning the inner flanges will remain
inside until the cap and lifting brackets
4. Assure good horizontal
alignment of the panels.
Good alignment of the
bottom edge of the panels is
important for good seal
between the lower and upper
5. To provide a clean caulked
seam all around the panels:
apply painters masking tape
to the outside perimeter of
each of the panels about ¼“
from the top, bottom, left and
right edges at each flange
joint. The tape will be
removed just before the
radome caulking has had time
to set.
NOTE: It is extremely important to
assure that the flanges are properly
aligned before the bolts are tightened
and kept in alignment as the hardware
is aligned. This is necessary for the
inside clearance and the outside
aesthetic appearance of the radome.
Please note this picture shown good
alignment as observed from inside the
radome and below a flange with bad
alignment.
EAR Controlled - ECCN EAR99