Step 6: Installation confirmation
Press the left push button to
complete the installation process or
press the right push button to exit
the commissioning mode.
This display is shown when the
right push button is pressed in the
previous step and indicates that
the installation process is not yet
complete.
Note: This display allows the
installer to take a decision to go
ahead with completion of the
installation process or exit the
commissioning mode.
Note: This display appears only
for 2 seconds, at the end of which,
the commissioning process is
terminated and the display returns
to the default display sequence.
To re-enter the comissioning
mode, long press the left push
button.
Step 7: Installation completion
This display is shown when the left
push button is pressed in the
previous step. The display indicates
that the installation is successfully
completed.
The Install code is displayed for 4
minutes.
The display returns to the default
display sequence at the end of the
timeout duration or if any buttton is
pressed.
Followed by
Once installed, the Auxiliary switch
(LC-1) functions as per the Active
tariff configured in the meter.