EasyManua.ls Logo

Shimadzu LCMS-8050 - Default Chapter; Table of Contents

Shimadzu LCMS-8050
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Contents
LCMS-8045/8050
Pre-Installation Requirements
1
Contents
1. INTRODUCTION ..................................................................... 3
2. INSTALLATION CONDITIONS ............................................... 5
2.1 Corrosive Gas and Dust...............................................................5
2.2 Ventilation and Open Flame Precautions .....................................5
2.3 Electromagnetic Noise .................................................................5
2.4 Installation Space.........................................................................5
2.5 Other Installation Conditions ........................................................5
2.6 System Size (Dimensions and Weight) ........................................6
2.7 System Installation Example ........................................................6
2.7.1 Connecting to the Rotary Pump ...................................................................... 7
2.7.2 Connecting to a PC........................................................................................ 8
2.8 Required Power Supply................................................................9
2.9 Gas.............................................................................................10
2.9.1 Nebulizer Gas Drying Gas and Heating Gas...................................................11
2.9.1.1 Using a Nitrogen Gas Generator.................................................................11
2.9.1.2 Using Gas Generated from Centralized Piping (Liquid Nitrogen).................. 12
2.9.1.3 Using a Gas Cylinder................................................................................. 12
2.9.1.4 When the Customer Already Has a Nitrogen Gas Generator ....................... 13
2.9.2 CID Gas (Argon Gas) ................................................................................... 13
2.10 Evacuation System...................................................................15
2.11 Reagents and Mobile Phase.....................................................16
2.12 Other Items to Be Prepared......................................................16
2.13 Import (Packing box size).........................................................17
2.14 Installation to Existing System (HPLC, LCMS).........................17
3. PRELIMINARY CHECK LIST................................................ 19

Related product manuals