Contents
LCMS-8045/8050
Pre-Installation Requirements
1
Contents
1. INTRODUCTION ..................................................................... 3
2. INSTALLATION CONDITIONS ............................................... 5
2.1 Corrosive Gas and Dust...............................................................5
2.2 Ventilation and Open Flame Precautions .....................................5
2.3 Electromagnetic Noise .................................................................5
2.4 Installation Space.........................................................................5
2.5 Other Installation Conditions ........................................................5
2.6 System Size (Dimensions and Weight) ........................................6
2.7 System Installation Example ........................................................6
2.7.1 Connecting to the Rotary Pump ...................................................................... 7
2.7.2 Connecting to a PC........................................................................................ 8
2.8 Required Power Supply................................................................9
2.9 Gas.............................................................................................10
2.9.1 Nebulizer Gas Drying Gas and Heating Gas...................................................11
2.9.1.1 Using a Nitrogen Gas Generator.................................................................11
2.9.1.2 Using Gas Generated from Centralized Piping (Liquid Nitrogen).................. 12
2.9.1.3 Using a Gas Cylinder................................................................................. 12
2.9.1.4 When the Customer Already Has a Nitrogen Gas Generator ....................... 13
2.9.2 CID Gas (Argon Gas) ................................................................................... 13
2.10 Evacuation System...................................................................15
2.11 Reagents and Mobile Phase.....................................................16
2.12 Other Items to Be Prepared......................................................16
2.13 Import (Packing box size).........................................................17
2.14 Installation to Existing System (HPLC, LCMS).........................17
3. PRELIMINARY CHECK LIST................................................ 19