Pre-Installation Requirements
(Installation Preparations/Confirmation)
Question and Answer IconNeed help?

Do you have a question about the Shimadzu LCMS-8050 and is the answer not in the manual?

Shimadzu LCMS-8050 Specifications

General IconGeneral
BrandShimadzu
ModelLCMS-8050
CategoryLaboratory Equipment
LanguageEnglish

Summary

1. Introduction

2. Installation Conditions

2.1 Corrosive Gas and Dust

Avoid installing the instrument in dusty or corrosive gas locations to prolong service life.

2.2 Ventilation and Open Flame Precautions

Ensures proper ventilation, avoids open flames, and includes fire safety measures.

2.3 Electromagnetic Noise

Advises against installing near strong magnetic equipment and suggests noise blocking.

2.4 Installation Space

Specifies firm, stable, flat surface requirements and clearance for maintenance.

2.5 Other Installation Conditions

Details temperature, humidity, overvoltage, pollution degree, and environmental factors.

2.6 System Size (Dimensions and Weight)

Provides dimensions and weight for LCMS-8050/8045 and rotary pump.

2.7 System Installation Example

Illustrates system layout and space requirements for top and front views.

Installation of Micro System; Micro ESI 8060

Details space requirements for Micro LC unit (LC-Mikros, CTO-Mikros) with LCMS 8045/8050.

2.7.1 Connecting to the Rotary Pump

Guides on using the specified Shimadzu rotary pump for optimal performance and safety.

2.7.2 Connecting to a PC

Instructs on connecting the PC using USB cables, with maximum length limits.

2.8 Required Power Supply

Specifies voltage, current, power capacity, and grounding requirements for the instrument.

2.9 Gas

Details the types of gases (Nitrogen, Dry Air, Argon) and their purity/pressure requirements.

2.9.1 Nebulizer Gas Drying Gas and Heating Gas

Explains tubing preparation and connection for Nebulizer, Drying, and Heating gases.

2.9.1.1 Using a Nitrogen Gas Generator

Provides specifications for the PEAK Scientific GENIUS 1051 nitrogen/dry air generator.

2.9.1.2 Using Gas Generated from Centralized Piping (Liquid Nitrogen)

Discusses using gas from centralized piping and the need for specific tubing.

2.9.1.3 Using a Gas Cylinder

Details connection adapters, regulators, and piping for gas cylinders.

2.9.1.4 When the Customer Already Has a Nitrogen Gas Generator

Specifies tubing joint for existing nitrogen gas generators with 1/4" tubing.

2.9.2 CID Gas (Argon Gas)

Covers piping and connection for Argon gas used as CID gas.

Precautions When Using High Pressure Gas Cylinders

Lists general safety precautions for handling high-pressure gas cylinders.

2.10 Evacuation System

Details venting requirements for rotary pump and solvent vapors to exhaust facilities.

2.11 Reagents and Mobile Phase

Lists standard samples, sensitivity check samples, and mobile phase components required.

2.12 Other Items to Be Prepared

Specifies drain bottles and reservoir bottles needed for operation.

2.13 Import (Packing box size)

Provides packing box dimensions, weight, and considerations for transport and handling.

2.14 Installation to Existing System (HPLC, LCMS)

Discusses sensitivity test criteria when installing to existing HPLC or LCMS systems.

3. Preliminary Check List

LCMS Check List

Provides a checklist of installation conditions for the customer to verify before installation.