EasyManua.ls Logo

SICK DUSTHUNTER SB30

SICK DUSTHUNTER SB30
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
8026957/AE00/V1-0/2021-08| SICKOPERATING INSTRUCTIONS | DUSTHUNTER SB30
Subject to change without notice
3 ASSEMBLY AND INSTALLATION
3.2 Assembly
Carry out all assembly work onsite. This includes:
Fitting the flange with tube
Fitting the MCU control unit,
Fitting the optional external purge air unit.
3.2.1 Fitting the flange with tube
Fig. 9: Fitting the flange with tube
WARNING:
Observe the relevant safety regulations as well as the safety notices during
all work: see “Important information”, page 6
Consider the equipment weight specifications when planning the mounting
brackets.
Only carry out assembly work on equipment with hazard potential (hot or
aggressive gases, higher internal duct pressure) when the equipment is at a
standstill.
Take suitable protection measures against possible local hazards or
hazards arising from the equipment.
All dimensions specified in this Section are shown in mm.
TOP
AA
A
A
> 30
Approx.
1°
Ø 195
Assembly on steel duct
Marking for assembly position
Assembly on brick stack Assembly on thin-walled duct

Junction plate
Duct wall
Anchor plate
Flange with tube
NOTE:
Maximum wall and isolation thickness are derived from the flange tube length
(350 mm or 700 mm) less the distance between flange and stack outer wall,
and stack immersion depth (> 30 mm).

Table of Contents

Other manuals for SICK DUSTHUNTER SB30