35
8026957/AE00/V1-0/2021-08| SICK OPERATING INSTRUCTIONS | DUSTHUNTER SB30
Subject to change without notice
START-UP AND PARAMETER SETTINGS 4
4.1.2 Fitting and connecting the sender/receiver unit on the duct
Connecting the sender/receiver unit to the purge air supply
▸ Check whether the purge air supply is available (the flow direction must be correct and
the purge air hose fits tight on the connection).
▸ Push the DN 40 purge air hose onto the sender/receiver unit connection and secure
with a strap retainer.
Assembly without weather hood
▸ Lay the seal on the flange with tube, position the sender/receiver unit in the flange with
tube and fasten with the assembly kit.
▸ Connect the connection line to the plug connector and screw tight.
Connections for connection line and purge air hose must always be at the bottom
(see “Device components DUSTHUNTER SB30M”, page 14).