EasyManua.ls Logo

SICK DUSTHUNTER SB30

SICK DUSTHUNTER SB30
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
8026957/AE00/V1-0/2021-08| SICKOPERATING INSTRUCTIONS | DUSTHUNTER SB30
Subject to change without notice
3 ASSEMBLY AND INSTALLATION
3.3.5 Connecting the sender/receiver unit
3.3.5.1 Work to be done
Connect the connection line.
3.3.5.2 Connection of connection line
Fig. 16: Plug connector connection to on-site line
NOTE:
Only use shielded lines with twisted pairs (e.g. UNITRONIC LiYCY (TP)
4 x 2 x 0.25 mm² from LAPPKabel; not suitable for underground laying).
Cable provided by customer according to
page 27, §3.3.2
Closed
Closed
Open
Open
A
A
A -A
+24 V
Note
To open, connect the plug connector to the plug
on the sender/receiver unit.
RS485 B
RS485 A

gnd
Shield

Table of Contents

Other manuals for SICK DUSTHUNTER SB30