Mechanical properties of the motors
3.3 Flange forms
1FT7 Synchronous Motors
Configuration Manual, (PFT7S) 01/2009, 6SN1197-0AD13-0BP2
61
Commissioning
When required, before connecting the motors and converters to the cooling circuit, the pipes
should be flushed in order to avoid dirt entering the motors and converters.
After the units have been installed in the plant, the coolant circuit must be commissioned
before the electrical systems.
3.3 Flange forms
Table 3- 9 Flange forms
Designation Representation Description
Flange 0
Flange 0, recessed
1FT7-0-
Flange 1
Flange 1,
compatible with 1FT6 motors
1FT7-1-

Table of Contents

Other manuals for Siemens 1FT7

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens 1FT7 and is the answer not in the manual?

Siemens 1FT7 Specifications

General IconGeneral
BrandSiemens
Model1FT7
CategoryEngine
LanguageEnglish