EasyManua.ls Logo

Siemens S7-300 - 3 Configuration and parameter assignment; 3.1 Configuring

Siemens S7-300
246 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Communication via Ethernet CPs in S7 stations
1.5 S7 communication via Industrial Ethernet
Configuring and commissioning S7 CPs for Industrial Ethernet
Configuration Manual, 09/2013, C79000-G8976-C182-13
25
Nodes
Two situations must be distinguished depending on the device type and plant configuration:
Client and server functionality at both ends
S7 connections can be operated between the following nodes with the entire functionality
of S7 communication:
between S7 stations S7300 and S7400;
between S7 stations and PC/PG stations with an Ethernet CP.
Figure 1-2 Nodes communicating on S7 connections over Industrial Ethernet
Client and server functionality at one end only (S7 connections configured at one end)
In the following situations, write and read functions can be implemented with PUT / GET
on S7 connections configured at one end:
S7 communication over routers
PG/PC stations can access S7 stations connected to a different subnet or subnet type
(PROFIBUS / Ethernet). This is only possible if the subnets are connected via routers
(for example IE/PB Link); in this case, S7 stations are servers.
S7 communication is possible via a gateway.

Table of Contents

Other manuals for Siemens S7-300

Related product manuals