5.5 Complete the installation work
1. Check that all of the screw connections are correctly tightened.
2. Once you have completed the installation work, remove all objects – such as tools, cloths,
deposits of dirt and moisture, etc. – from the machine.
3. Clean the machine to remove any dirt that may have accumulated as a result of the
installation work.
4. Protect all exposed rotating parts against contact by persons. Cover any open shaft ends,
couplings and belt drives, etc.
5. Make sure that there are no loose parts on or in rotating machine elements. Observe any
feather keys that may be located in free shaft ends.
Record all of the installation work that was carried out.
Assembly
5.5 Complete the installation work
SIMOTICS HV M 1RN76308PR900CG0-Z
Operating Instructions 07/2018 57