EasyManua.ls Logo

Siemens SINAMICS G120 - Commissioning; Commissioning Sequence

Siemens SINAMICS G120
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
6
6.1 Commissioning sequence
We recommend that you commission the basic positioner using a PC tool.
PC tools
STARTER and Startdrive are PC tools that are used to commission, troubleshoot and control the
converter, as well as to back up and transfer the converter settings. You can connect the PC with
the converter via USB or via the PROFIBUS / PROFINET 󹪝eldbus.
Connecting cable (3 m) between PC and converter: Article number 6SL3255-0AA00-2CA0
Startdrive DVD: Article number 6SL3072-4CA02-1XG0
Startdrive, system requirements and download (https://
support.industry.siemens.com/cs/ww/en/view/109760844)
Startdrive tutorial (http://support.automation.siemens.com/WW/view/en/73598459)
STARTER videos (http://www.automation.siemens.com/mcms/mc-drives/en/low-voltage-
inverter/sinamics-g120/videos/Pages/videos.aspx)
Basic positioner
Function Manual, 09/2020, FW V4.7 SP13, A5E34257659B AG 35

Table of Contents

Other manuals for Siemens SINAMICS G120

Related product manuals