EasyManua.ls Logo

Siemens SINAMICS PM240-2 - IT system

Siemens SINAMICS PM240-2
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connecting-up
5.2 Connecting the line and motor cable at the inverter
Power Module PM240-2
Hardware Installation Manual, 01/2017, A5E33294624B AE
51
Connect cables at the inverter so that they are EMC compliant
Attach the cable tie holders to the Power
Module as sho
wn to the left in the diagram
before you establish the connections.
Fix the line connecting cable using a cable tie
as shown in
.
Fix the shield of the motor connecting cable
using a hose clamp (
).
Connect the shield of the control cable with
the shield
plate of the Control Unit () using
a steel band. Also attach the control cable to
the Power Module using a cable tie (
).

Table of Contents

Other manuals for Siemens SINAMICS PM240-2

Related product manuals