SINAMICS V20 Converter
Operating Instructions, 10/2019, A5E34559884-012
53
Commissioning via the built-in BOP
Note
For a detailed description of parameter settings for the quick commi
ssioning, refer to the
Quick commissioning (Page 63)".
Hot surface
During operation and for a short time after the power supply of the converter is switched off,
the marked surfaces of the converter can reach a high temperature. Avoid coming into
direct contact with these surfaces.
5.1 The built-in Basic Operator Panel (BOP)
5.1.1 Introduction to the built-in BOP