4. Click on the OK button.
9 The "Procedure started" window closes.
9 WaveNet Manager reaches LockNode.
5.6.4 Test reachability (LSM)
You can use LSM to test whether the network node of a WaveNet locking
device is functioning properly and can be reached by LSM.
ü LSM is open.
ü WaveNet is created.
ü WaveNet topology imported (see
LSM import [}64]
).You will see a list
of WaveNet-relevant components.
1. Open the assignment via |Network| - Group orders - WaveNet nodes .
9 The window "Group order for WaveNet nodes" opens.
WaveNet (Manual)
5. WaveNet Manager
177 / 210