EasyManua.ls Logo

Simrad ES60 - INSTALLATION REV A - Page 120

Simrad ES60 - INSTALLATION REV A
162 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Simrad ES60
Hull w ith at bottom
If the vessel’s hull is at you do not need a fairing. The
transducer is then be bolted directly to the hull using two bronze
or stainless steel bolts (I) and a cable bushing. Note that the
cable bushing must be mounted with proper gaskets (4) under
and over the hull, as well as sealing compound (J) around its
body. Also, ll the bolt holes with a lling compound to ensure
a smooth transducer surface.
C
J
I
F
4
3
(CD017007C)
(C) = Filling compound
(F) = Forward
(I) = Threaded rod with nuts and washers, or bolt
(3) = Washer
(4) = Rubber gasket
118
304699/A

Table of Contents

Related product manuals