EasyManua.ls Logo

Sirman PLL 300 - Checking Packaging Upon Delivery

Sirman PLL 300
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
If packaging shows
signs of damage caused
during transport, the carrier must be informed
immediately; moreo-ver a detailed report on the
extent of the damage caused to the machine
must be notified to the carrier within three days
fr
om the delivery date on the shipping
documents. If there are no
1.2 - CHECKING PACKAGING UPON DELIVERY
Heav
yweight package. Do not manually lift without
the help of at least three people
(Fig. n°5).
To handle and
move the package use suitable
manual or electric material handling equipment
fitted with suitable lifting accessories (Fig. n°6).
Do not expose the package to humidity or rain
(Fig. n°4).
As the centre of grav
ity of the package is off-centre
do not to use lifting slings (Fig. 7)) to ove the
package (Fig. n°7).
Fig. n°4
Fig. n°6
Fig. n°5
Fig. n°8
Fig. n°7

Related product manuals