EasyManua.ls Logo

Skipper DL2 User Manual

Skipper DL2
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
DL2
Dual Axis Doppler Speed Log System (SOG+STW)
Installation Manual
SKIPPER Electronics AS Telephone: +47 23 30 22 70
Enebakkveien 150 Telefax: +47 23 30 22 71
P. O. Box 151, Manglerud E-mail: support@skipper.no
0612 Oslo, Norway Co. reg. no: NO-965378847-MVA
www.skipper.no
Document no: DM-M002-SA
Rev: 1723A
Date: 2018-05-28
(for softwares up to 1.0.14 &1.1.0)
BRIDGE
FORE PEAK
115-230VAC
/ 24VDC
DL21SG-SA
DL21 sensor
w/40m cable
in Sea valve
SB-100-SB
JB21-SA
Junction box
JB70D21-SA
Electronic Unit
Sensor extension cable.
Yard supply.
6 x twisted shielded pairs
Dimension: see DL2 manual Chapter 3.
JB12-SA
Junction box
DL2SG-SA
DL2 sensor
w/40m cable
in Sea valve
SB-100-SB
JB70D2-SA
Electronic Unit
Sensor extension cable.
Yard supply.
3 x twisted shielded pairs
Dimension: see DL2 manual Chapter 3.
CU-M001-SA Operator Unit for DL2
LAN cable. CAT6. Max. 100m
24VDC
Question and Answer IconNeed help?

Do you have a question about the Skipper DL2 and is the answer not in the manual?

Skipper DL2 Specifications

General IconGeneral
DisplayColor LCD
Channels12
Waterproof RatingIPX7
ConnectivityNMEA 0183
ChartsPreloaded

Summary

Chapter 1: Getting Started

Power Supply Requirements

Specifies the necessary power sources for the DL2 system components.

Chapter 2: Hardware Mounting

Placement of the Sea Valve

Mounting instructions for the sea valve for sensor installation.

Placement of the Sensor in Sea Valve

Procedures for installing the DL2 sensor into the sea valve.

Chapter 3: Wiring

CU-M001-SA Operator Unit Wiring

Details the wiring connections for the operator unit.

JB70D2-SA Electronic Unit Wiring

Explains the wiring for the electronic unit.

Chapter 4: Setup Procedure

CU-M001 Setup

Configuring the operator unit settings.

JB70D2 Setup

Configuring the electronic unit settings.

DL2 Setup

Setting up DL2 specific parameters for vessel calibration.

Alarm/Alert Setup

Configuration of system alarms and alerts.

System Diagnostics

Performing system tests and checking operational status.

Chapter 6: Solving Problems

Software Upgrade

Procedure for upgrading the system software via LAN.

Appendix 4: Connecting 2 Systems

Connecting Two Systems

Instructions for connecting two DL2 systems together for synchronized operation.

Appendix 4: Commissioning Checklist

Commissioning Checklist

A checklist for verifying system installation and functionality.