EasyManuals Logo

Skipper DL2 User Manual

Skipper DL2
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
Page 10 of 60
2018-05-28
Installation DL2 Doppler Speed Log System
CHAPTER 2: HARDWARE MOUNTING
placemenT Of The OperaTOr uniT
The operator unit is placed on the bridge.
Some standards require some operations of
the unit to be available from ‘standing position’.
These operations are available from the operator
unit and multi-repeaters if both input and output
are connected.
Dimensional drawings are found in Appendix 1.
Flush mount installation
Wall mount installation

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skipper DL2 and is the answer not in the manual?

Skipper DL2 Specifications

General IconGeneral
BrandSkipper
ModelDL2
CategoryMarine GPS System
LanguageEnglish