SJ46 AJ, SJ51 AJ, SJ63 AJ 213210AAAA
43
Visual and daily maintenance inspections Section 4 – Inspections Before Operation
4.2-7 Base
Do the inspection that follows:
1
Turret transportation lock
▪
Make sure the turret transportation lock is
unlocked.
▪
Make sure there are no loose or missing parts.
▪
Make sure there is no visible damage.
Axles
▪
Make sure the
2
front and
3
rear axles are
correctly attached.
▪
Make sure there are no loose or missing parts.
▪
Make sure all the ttings and hose connections
are tight.
▪
Make sure there is no sign of hydraulic
leakage.
4
Tie rod
▪
Make sure there are no loose or missing parts.
▪
Make sure the tie rod end studs are attached
and tight.
▪
Make sure there is no visible damage.
5
Oscillating cylinders
▪
Make sure the cylinder assembly that
oscillates is correctly attached, and there are
no visible spaces.
▪
Make sure there are no loose or missing parts.
▪
Make sure all the ttings and hose connections
are tight.
▪
Make sure there is no sign of hydraulic
leakage.
NOTE
The oscillating axle is locked when the MEWP is
in the elevated travel position or at the elevated
travel speed.
1
3
2
4
5
5