EasyManua.ls Logo

SMA SUNNY HOME MANAGER 2.0 - Getting Started; Creating a Sunny Home Manager System in Sunny Portal

SMA SUNNY HOME MANAGER 2.0
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 Getting Started
SMA Solar Technology AG
Operating manual 29HM-20-BE-en-19
9 Getting Started
9.1 Creating a SunnyHomeManager System in SunnyPortal
SunnyPortal is used as the user interface of the SunnyHomeManager. In general and in this document, systems
equipped with a SunnyHomeManager are referred to as a "SunnyHomeManagersystem."
To create a Sunny Home Manager system for the first time or a new one, you must use the system setup assistant of
Sunny Portal at www.sunnyportal.com/register.
The system setup assistant will guide you through all further steps:
User registration
Registration of the SunnyHomeManager system
System properties such as the system name and password
Registration and identification of the SunnyHomeManager
Configuration of the energy meter
Extended system properties such as the nominal system power, location, annual yield, feed-in tariffs, and
more.
In the User Information column, the system setup assistant provides helpful background information and other
information for all entries.
Even if you already have a PV system in which you want to integrate a
SunnyHomeManager, you have to create a new system.
Only after the SunnyHomeManager has been registered, can other devices in the system be detected or further
devices integrated.
In order to be able to transfer the devices of the previous system to the new SunnyHomeManager system, you
must first deactivate these devices (usually at least 1 inverter) in the old system. Then you can add the devices to
the new system.
The procedure for adding or replacing devices is described under Configuration > Device overview >
Overview of new devices.
Requirements:
The PV system and all devices in the local network must be in operation and connected to the
SunnyHomeManager via a router.
The registration ID (RID) and the identification key (PIC) must be available. The information can be found on the
type label that is attached on the side of the product as well as on the label provided.
The status LED must glow green and the performance LED must be off on the SunnyHomeManager.
In order to be able to display PV generation and consumption in your household, energy meters for the
measurement of the power- and energy values must be connected. By default, the SunnyHomeManager fulfills
this requirement.
Procedure:
1. Start the web browser and go to www.SunnyPortal.com/register.
The system setup assistant opens and guides you through all the steps.
2. Click on [Next].
The page User registration opens.
3. Activate the field I am not yet registered and click on [Next].
4. Enter the necessary data for registration.
5. Click on [Next].
After a few minutes you will receive an e-mail containing a link and your access data to SunnyPortal.

Table of Contents

Other manuals for SMA SUNNY HOME MANAGER 2.0

Related product manuals