24. Enter the Specific annual yield.
You can obtain the specific annual yield for your system location from irradiation maps.
25. Enter the data for the location of the system.
26. Enter the Feed-in tariff if applicable.
The feed-in tariff is given to you by your local network provider.
27. If you want to consume the energy produced by your system yourself, to switch loads for example, you have to
answer the question of Self-consumption with Yes.
28. At Limiting of the active power feed-in, select the required option and make the required settings.
The limitation of the active power feed-in may have to be set according to the specifications of your grid operator.
29. Set Automatic updates: the automatic updates must be activated to ensure smooth communication within the
system.
30. Enter the E-mail address of the operator.
31. Click on [Next].
☑ The system setup assistant shows a summary of your entered data. You have the possibility to check your
information and correct it if necessary.
32. If all the information is correct, click on [Finish].
☑ The basic configuration is completed.
☑ Sunny Portal will confirm on the next page that your system registration was successful.
A message also appears indicating that communication monitoring has been activated and that you will
receive a daily report by e-mail every day.
33. To go to the SunnyHomeManager system, click on [To the PV system].
☑ The user interface of your system opens.
Figure 7: Entries for setting up a system (example)