The following process diagrams provide an overview on the start/stop behavior of the
Sunny Island 5048 during manual generator operation:
Generator interface #242.07 GnSrtMod manual; start at the generator
Generator interface #242.07 GnSrtMod autostart; start at the
generator
1 Manual generator start
2 "Generator operation" detected, warm up
phase begins
3 Internal generator request is ignored
4 Warm up phase is completed, generator is
connected
5 Generator current limit
6 Current is reduced, battery absorption phase
7 Manual generator stop, generator is
disconnected
8 Minimum stop time has expired
1 Manual generator start
2 "Generator operation" detected, warm up
phase begins
3 Warm up phase completed
4 Generator is connected
5 Generator current limit
6 Current is reduced, battery absorption phase
7 Manual generator stop, generator is
disconnected
8 Generator is disconnected, stop time begins
9 Stop time ends Stop time ends
Gn
GnReq
TrfRel
ExtCur
Warm up time
Stop time
8
7
6
5
4
1
2
3
Gn
GnReq
TrfRel
ExtCur
9
8
7
6
5
4
1
2
3