SMA Solar Technology AG 7 Commissioning
Installation Manual SI80H-60H-OffGrid-IA-en-11 115
7.24 Functional Test
7.24.1 Testing Communication Interfaces
If communication interfaces are installed in the off-grid inverter, test that they have been installed
correctly as follows:
1. Switch to installer mode (see Section 7.5).
2. To test the installation of the SI-SYSCAN.BGx Multicluster communication interface, select the
312.15 ComMod1 parameter and read off the value.
The value is SI-SysCan.
Is the value ‒‒‒?
The communication interface is not plugged into the interface slot correctly.
Ensure that the communication interface is plugged into the SISysCan interface slot.
Ensure that the communication interface has been installed correctly
(see the SI-SYSCAN-NR mounting instructions).
3. To test the installation of the RS485 SI-COMSMA.BGx communication interface, select the
312.16 ComMod2 parameter and read off the value.
The value is SI-ComSma.
Is the value ‒‒‒?
The communication interface is not plugged into the interface slot correctly (see the mounting
instructions for the communication interface).
Ensure that the communication interface is plugged into the SiComSma interface slot.
Ensure that the communication interface has been installed correctly
(see the SI-COMSMA-NR mounting instructions).