EasyManua.ls Logo

SMA SUNNY ISLAND 8.0H - Operating and Configuring the Off-Grid Inverter

SMA SUNNY ISLAND 8.0H
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Mounting SMA Solar Technology AG
30 SI80H-60H-OffGrid-IA-en-11 Installation Manual
Observe permitted mounting position:
Figure11: Permitted and prohibited mounting positions
Mount the off-grid inverter in a permitted mounting position. The control panel should be at eye
level. This will make it easier to operate the buttons and view the LED signals.
5.3 Mounting the Off-Grid Inverter
Additionally required mounting material (not included in the scope of delivery):
At least two screws that are suitable for the mounting surface
At least two washers that are suitable for the screws
At least two wall plugs that are suitable for the mounting surface and the screws
If the inverter is to be secured against theft, two safety screws that can only be unscrewed with
a special tool
1. Mark the position of the drill holes using the wall mounting bracket. Use at least one hole on the
left-hand side and one on the right-hand side of the wall mounting bracket.
2. Ensure that there are no electric lines or other supply lines in the wall behind the marked
positions.
3. Drill the holes and insert the wall plugs.
4. Secure the wall mounting bracket horizontally to the wall using screws and washers.
5. If the off-grid inverter is to be protected against theft, mark the drill holes for anti-theft protection
(see Section 5.2"Selecting the Mounting Location for the Off-Grid Inverter",page27). Use at
least one hole on the left-hand side and one on the right-hand side.
Off-grid inverters with the order options "Communication for RS485" or
"Multicluster system"
Any ordered communication interfaces are installed in the master at the factory.
For single-cluster systems and multicluster systems, mount the off-grid inverters with
integrated communication interfaces at the planned mounting locations for masters.

Table of Contents

Other manuals for SMA SUNNY ISLAND 8.0H

Related product manuals