5 Mounting SMA Solar Technology AG
26 SI80H-60H-OffGrid-IA-en-11 Installation Manual
5Mounting
5.1 Mounting Sequence
Procedure See
1 Mount/install the Multicluster Box, if present. Multicluster Box installation
manual
2 Select the mounting location for the off-grid inverter and mount
the off-grid inverter.
Section 5.2 … 5.3
4 Mount the Sunny Remote Control. Sunny Remote Control
mounting instructions
5 Install the battery and ensure that only skilled persons and
operators can enter the battery room.
Battery manufacturer's
documentation
6 Mount BatFuse. BatFuse installation manual
7 Mount the main distributions and sub-distributions. Manufacturer's
documentation
8 If planned for the off-grid system:
Mount the PV inverters and wind power inverters.
Inverter installation manual
9 If the external energy source is a combination of electricity grid
and generator:
Mount the transfer switch.
‒
10 If planned for the off-grid system:
Mount the Sunny Island Charger 50 devices.
Sunny Island Charger 50
installation manual
11 If planned for the off-grid system:
Mount the generator.
Manufacturer's
documentation
12 For with electrical remote-start function but without their own
control system:
Mount the GenMan.
GenMan technical
description
13 If planned for the off-grid system:
Mount communication devices.
Communication device
installation manual
14 If DC loads or charge controllers apart from Sunny Island
Charger 50 are present:
Mount the battery current sensor between BatFuse and battery.
‒