SMA Solar Technology AG 6 Electrical Connection
Installation Manual SI80H-60H-OffGrid-IA-en-11 55
If you are using a multi-function relay, always connect it as follows:
Additionally required material (not included in scope of delivery):
2 bootlace ferrules
Requirements:
The technical requirements of the multi-function relay must be met (see Section 12"Technical
Data",page144).
Conductor cross-section: 0.2 mm² ... 2.5 mm²
1. Break through the cable feed-through plate at a suitable position using a sharp object.
2. Strip the insulation from the cable and press bootlace ferrules onto the wires.
3. Lead the cable through the hole in the cable feed-through plate into the off-grid inverter.
Assignment of the multi-function relays of the slaves
In case of a fault, the multi-function relays of the slaves switch less reliably than the multi-function
relays of the masters. If a fault occurs, the slaves wait for error confirmation from the master.
4.
Danger to life from electric shock due to incorrect insulation
Cut the silicone tube to the length of the cable.
•Pull the silicone tube over the cable.
The cable is double-insulated.
Lead the cable into the off-grid inverter making sure that it cannot touch any data cables.