6.3 Commissioning
The main interface:
Fig 15. Screen of ME3000SP
If you didnt change the work mode of ME3000SP, which means ME3000SP is working in Auto Mode”:
WhilePV Production> Home Consumption(fig 15)
If the battery is not full. ME3000SP will charge the battery.
WhilePV Production< Home Consumption(fig 15)
If the battery is not flat. ME3000SP will discharge the battery.
Every time you change the CT connection, you need to restart ME3000SP. Please follow the following procedure:
1. Turn OFF PV inverter. Turn ON some home appliances.
2. Turn OFF AC circuit breaker (grid) / DC isolator (battery). Wait 5 minutes.
3. Turn ON DC isolator (battery), then turn ON AC circuit breaker (grid). Wait 1 minute.
4. Turn ON PV inverter.