⚫ When mounting the equipment, make sure that the mounting surface is sturdy and meets the
equipment's load-bearing requirements.
⚫ The line holes need to be sealed. The line holes that have been lined are sealed with sealing
mud, and the line holes that have not been lined are sealed with the cover of the equipment.
⚫ After installing the equipment, empty packing materials such as cardboard boxes, foam,
plastic, cable ties, etc. should be removed from the equipment area.