to troubleshoot before proceeding with the next cabinet consolidation operation
Step 4: After the pressure test is completed, insert a plastic tube with an outer diameter of 8mm
into the discharge port for pressure relief. Do not proceed to the next step until the pressure relief is
complete to avoid unnecessary injury. After completing the pressure relief, remove the fixture, install
the removed sealing ring, clamp, and cover back in place, and tighten the clamp screw with a torque
wrench to 6-8Nm. Remove the pressure relief plastic pipe and close the ball valve of the first stage
pipeline.
Figure 5.13 Schematic diagram of discharge port
Figure 5.14 Plastic pipe