EasyManua.ls Logo

SolaX Power X3 Series - Installation; Checking Outer Packing and Deliverables

SolaX Power X3 Series
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
4 Installation
4 1 Checking the Outer Packing.
a When receiving the inverter check that the packing materials are intact. , .
. , , ,b After unpacking check that the deliverables are complete intact and consistent with your
order list.
c Examine the PV inverter and its fittings for damage such as scraps and cracks. .
Do not install the inverter on flammable building materials or in an
area that stores flammable or explosive materials.
Do not install the inverter in a place where personnel are likely to
come into contact with its enclosure and heat sinks to avoid electrical
shock/burn.
Figure 4 1 The deliverables: The inverter and its fittings.
The deliverables in the fittings of inverter
CAUTION
DANGER
AC output connector
The inverter
Items Deliverables
File package
Rear panel
A
F
G
E
D
C
B
Bolt group (including screw, nut)*3
(reserved for tighteningthe support and rear panel)
M6 screw
DC terminal connector group
G
Removal tool for DC connectors
RS485 terminal block
RS485 connector
H
I J
H
I
J

Table of Contents

Related product manuals