35
ger, insert the two rotor retainers with the cham-
fered side down into the groove adjacent to the
poppet valve seat area of the rotor.
Step 27 Finally, lower the rotor with the retain-
ers installed into the head, engaging the rotor
retainers to the 2 locating pins.
Step 28 Locate the poppet valve shims that
were removed during disassembly or new
shims totaling the identical thickness of those
removed. See the Part Inspection Section and
the individual specification for replacement shim
thickness, part numbers and configuration. In-
stall the shims into the poppet valve bore en-
suring that they are properly seated at the bot-
tom of the bore.
Step 29 Install the poppet valve spring.
Fig. 4.26
Fig. 4.27
Fig. 4.28
Fig. 4.29