4.8 Feed-in management
Depending on the country, photovoltaic systems must have the possibility of being reduced in the
fed-in effective power by the network operator. The following products are recommended for
implementing this legally prescribed specification:
n StecaGrid SEM
n WEB'log from Meteocontrol
n Solar-Log from Solare Datensysteme
n Energy-Manager from Kiwigrid
Furthermore, an energy meter can be used for feed-in management. It must be connected to the
Modbus RTU interface and meet the preconditions specified in the chapters 3.6.7 and 3.6.8.
———————————————————————————
Note
The settings for feed-in management must be made in the
sub-menu 'Energy management'.
———————————————————————————
Mode
1. Press SET to call up the item.
2.
Press s to select "Energy meter".
3. Press SET.
4. Press ESC to go one level higher to Energy management.
Dynamic feed-in regulation
———————————————————————————
Note
The power fed into the grid is adjusted in 10 W steps. It can
be limited to a minimum of 0 W.
———————————————————————————
EN
747,431 | Z09 | 2015-09-30
47