4-3
Installation Operator/Maintenance Manual P129391-130
STEP 2: Loosen two 1"-8 UNC nuts on front casters, run them
together and tighten slightly.
• Once run together, turning nuts should also turn
1"-8 UNC caster stem.
STEP 3: Turn 1"-8 UNC nut (and caster stem) as required to raise or
lower top of carriage and rollers as required to achieve
1/8" (3 mm) gap.
• Adjust both sides of transfer carriage evenly.
STEP 4: When 1/8" (3 mm) gap is achieved, run nuts back to
starting positions and tighten.
Run-Together
Nuts
Caster Stem
STEP
2
3
STEP
4
Run Nuts Back To
Start and Tighten