Site Preparation Guide Site Preparation Checklist
Page 24
Site Preparation Checklist
Electrical Installation Requirements
A dedicated 120/208V 3 phase 50/60hz 30A circuit has been installed.
An electrical wire with bare leads has been supplied by the customer to connect the printer
to the facility power.
If utilizing a LAN connection, the LAN connection is within 4 meters (14 feet) of the printer.
Environmental Requirements
The site’s environmental temperature is between 59°F to 86°F (13°C to 30°C).
The site’s environmental humidity is between 30% to 70%, non-condensing.
The site’s altitude does not exceed 6561.68 feet (2000 m).
Required Installation Tasks
GrabCAD Print software has been downloaded and installed on the user’s workstation PC.
The Welcome Kit and startup materials have been removed from the oven chamber.