Objet500 User Guide 6 Operating and Maintaining the Objet500 3DPrinter
DOC-07027 Rev.E 6-66
2. Leadthecableoutoftheprintersothatyoucanclosetheprinter,and
tapeitdowntomakesurethatitdoesnotinterferewiththemovingprint
block.
Tapethecabletothebuildtraytokeepitinplace.
Figure6-96CorrectUV-sensorplacement
3. Closetheprinter,whilecheckingthatthesensordoesnotmoveoutof
position.
4. SettheUVmetertomeasuremJ/cm2.
5. Settherangeonthemeterto2,000.
6. ConnectthecablefromthesensortotheUVmeter.
7. TurnontheUVmeter,andwaituntil“000.0”appearsonthedisplay.
8. Inthewizardscreen,confirmthatthesensorispositionedcorrectly,and
clickNext.
Continuewith"UVMeasurement"below.
UVMeasurement
TheUVlampspowerupandstabilize.(Thistakesseveralminutes.)Then,the
printblockpassesoverthesensorandthewizardcomparesthemeasured
radiationtotherecommendedlevelforeachUVlampandprintingmode.
Duringthisprocess,whichtakes20–40minutes,youneedtomonitorthe
progressasdisplayedinthewizardscreen.