Index-1
IndexIndex-
A
adapters. See PCI adapters
APC UPS, 2-7
PowerChute Network Shutdown, 2-6
AS/NZS 3112-1993 connector, B-10
A-side power source, 2-1
ASN
site planning, 3-3, 4-9
B
bezel
illustrated, 9-2
installing, 9-23
BMC, A-6
BS connector
1363/A, B-10
B-side power source, 2-1
C
cabinets
configuration planning, 5-1, 5-5
requirements, 6-1
specifications, A-3
cables
Ethernet, 4-5
Ethernet network, 10-6
Fibre Channel, 4-3
managing, 10-4, 11-2
planning for, 3-3, 4-1
routing, 10-4, 11-2
telephone, 3-3
CAC, getting assistance, 1-2
cage nuts
front rail locations, 9-16
illustrated, 9-2
inserting, 9-8
CEE connector
(7) VII, B-9
checklist for site planning, 1-2
circuit, electrical
planning information, B-1
wiring diagrams, B-2
communications cables
planning for, 4-1
compliance, 1-1
connectors, electrical, B-9
BS 1363/A, B-10
CEE (7) VII, B-9
GB1002-1996, B-10
IEC 60309, B-9
NEMA 5-15, B-9
NEMA L6-20, B-9
SAA/3/15 AS/NZS 3112-1993, B-10
SABS 164-1:1992, B-9
SEV 1011-S24507, B-10
CPU-I O enclosures
installing, 9-21
current requirements
from PDU, 5-2
Customer Assistance Center. See CAC
D
documentation
ftScalable storage systems, 10-5
dust contamination, 3-2
E
earth reference ground, B-1
electrical
connectors, B-9
grounding, B-1
power planning, 2-1
wiring, B-1
embedded Ethernet ports, 4-5
environmental requirements
maximum rate of temperature change, A-4
operating humidity, A-5
storage humidity, A-5