Figures
vi Stratus ftServer 29x0, 49x0, and 69x0 Systems: Site Planning and Installation Guide (R786)
Figures
Figure 6-1. Rail Clearance 6-4
Figure 9-1. System Components 9-2
Figure 9-2. EIA Vertical Rail Hole Pattern 9-4
Figure 9-3. Numbering the Middle Hole of 6U 9-5
Figure 9-4. PDU Components 9-7
Figure 9-5. Cage Nut Locations: PDU 9-8
Figure 9-6. Inserting Cage Nuts 9-9
Figure 9-7. Installing the Lower PDU (at U Number 1) 9-10
Figure 9-8. Installing the Upper PDU (at U Number 2) 9-11
Figure 9-9. Screw Locations on the Rear Vertical Rails 9-12
Figure 9-10. Attaching the Mounting Brackets and Inserting Guide
Screws (Rear View) 9-13
Figure 9-11. Removing the Front Panel from the Shelf Unit 9-14
Figure 9-12. Removing the System Backplane 9-15
Figure 9-13. Cage Nut Locations on Front Vertical Rails 9-16
Figure 9-14. Mounting the Shelf Unit on the Mounting Brackets 9-17
Figure 9-15. Securing the Shelf Unit to the Front Rails 9-18
Figure 9-16. Securing the Shelf Unit to the Mounting Brackets 9-19
Figure 9-17. Replacing the Front Panel in the Shelf Unit 9-20
Figure 9-18. Installing the CPU-I/O Enclosures in a Cabinet 9-22
Figure 9-19. Installing the Bezel 9-24
Figure 10-1. System Ports 10-3
Figure 10-2. Connecting Cables to the Modem 10-8
Figure 10-3. Mini-SAS (SFF-8088) Connector 10-9
Figure 10-4. Connecting a Tape Drive to an ftServer System 10-10
Figure 11-1. Connecting a System Directly to AC Power 11-3
Figure 11-2. Connecting a System to a UPS 11-5
Figure 11-3. Connecting the Systems Directly to PDUs 11-7
Figure A-1. ftServer 2900, 4900, or 6900 System:
CPU-I/O Enclosures: Front View A-2
Figure A-2. AAP87600PDU A-8
Figure B-1. Star Ground Example B-2
Figure B-2. PDU Power Input Labeling B-3
Figure B-3. ftServer Enclosure Power Input Labeling B-3
Figure B-4. Single-Phase 120V AC Circuit Connection B-4
Figure B-5. Single-Phase 240V AC Circuit Connection B-5
Figure B-6. Split-Phase 120/240 Volts AC Circuit Connection B-6