Safety
V 152 10 11 Rev.: END
2-8
2.10.2
Hydraulic system
Only personnel with specialist knowledge and experience in the area of hydraulics
may work on the hydraulic equipment!
When performing maintenance work on the hydraulic system, the maintenance
personnel must be completely familiar with the hydraulic circuit diagram and must be
acquainted with function as well as the possible consequences of any faulty
operation.
Check on a daily basis all pipelines, hoses and screwed connections for leaks. If
there are any leaks, immediately shut down the gantry press and repair the fault.
Collect any escaping hydraulic oil and dispose of correctly.
Before working on the hydraulic accumulators, ensure that the accumulator circuits
have been deenergised.
Before starting repair work, depressurise system sections and pressure lines which
are to be opened!
Before starting maintenance work, remove all types of soiling from connections and
screwed connections of the hydraulic system and, if required, rinse them once
maintenance work has been completed.
The maximum permitted service life of the hydraulic hoselines is six (6) years,
including any storage times! The storage duration must not exceed two years.
2.10.3
Noise
The A-rated equivalent continuous sound pressure level at the operator workstations
during normal operation of the gantry press is below 80 dB(A).
On account of the local conditions and different materials, there may be a higher
sound pressure level at the installation site of the gantry press. In this case the plant
operator is obliged to provide the operating personnel with the appropriate protective
equipment.