EasyManua.ls Logo

Strautmann PP 1207 - 6.2 Cleaning schedule

Strautmann PP 1207
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Servicing
V 152 10 11 Rev.: END
6-3
6.2
Cleaning schedule
Clean the listed areas on the gantry press following every bale ejection
While the pressing shield (1) is
positioned on the bale, wipe down the
pressing shield at the top
Fig. 6-1: Cleaning pressing shield
Once the bales have been ejected, use
the brush to clean the tape slots (2)
Fig. 6-2: Cleaning tape slots
Sweep out the floor below the ejector
plate (3).
Fig. 6-3: Sweeping floor
Clean the following areas on the gantry press once weekly.

Table of Contents

Related product manuals