Transportation and
installation
V 152 10 11 Rev.: END
4-5
Caution!
The gantry press may suffer considerable damage.
There must be a clockwise rotating field on the socket of the
operating voltage.
Before switching on the machine for the first time, check the
rotating field of the socket.
4.4.3
Hydraulic system
Fill the hydraulic unit with the specified hydraulic oil. Use fluid of the same grade and
viscosity only - DIN-HPL 22, ISO-HM 22.
Information!
See also Chapter 6.3.4 Hydraulic oil
4.5
Checklist
After delivery and whenever the gantry press is installed, the following checks must
be performed:
Date Name
Check the gantry press for completeness in line with the
shipping note.
Visible inspection for signs of damage and damage in transit
(damage report to be sent immediately to manufacturer,
haulage company or service engineer).
Install the gantry press on a base with adequate load-bearing
capacity (see Chapter 4.4.1 Installation).
Check oil level of the hydraulic unit.
Apply voltage to the gantry press. (see Chapter 4.4.2 Electrical
connection, observing rotating field)
First manually test-run the gantry press without any material
With the machine running, check the electrical function of the
safety switches:
If the flap and/or door is opened during operation, the gantry