Transport, Set-up and Connection
4 — 4 04_0008_0508GB
The set-up site of the machine is usually determined and appropria-
t
ely prepared by the site management.
Notes
The responsibility for setting up the machine safely falls on the ope-
rator.
Inspect the proposed site carefully and reject the set-up site if you
have any doubts in respect of safety.
-- The loadbearing capacity of the supporting ground must be suffi-
cient to withstand the weight of the machine.
-- The supporting ground must be horizontal and even.
Danger
Keep a safe distance away from pits and slopes.
Never prop up the machine.
Continually check the stability of the machine during operation.
" Move the machine to its operating position (horizontal).
4.4 Selecting the set-up
s
ite
4.5 Set-up site
requirements