Operation
6 — 9
05_0186_0802GB
The tank pressure of machines without automatic mode must be
c
hecked regularly during operation.
" Check the tank pressure on the ”tank pressure” gauge.
Caution
The tank pressure must remain constant and should never fall below
5 bar.
Set the working pressure accordingly.
Interrupt operation as follows:
" Stop the material flow.
" Close the air valve on the spray gun.
⇒ The compressor switches off automatically.
Resume operation as follows:
" Open the air valve on the spray gun again.
" Start the material flow again.
⇒ The compressor switches on again automatically.
⇒ The spray gun is now ready for use again.
Stop delivery as follows:
" Stop the material flow.
" Close the air valve on the spray gun.
⇒ The compressor switches off automatically.
" Switch off the machine. Refer also to chapter:
”Starting up” -- section: ”Shutting down the machine after
starting up”.
" Carry out all steps described in the section on temporary
decommissioning. Refer also to chapter:
”Decommissioning” -- section: ”Temporary decommissioning”.
Interrupting operation
Resuming operation
Stopping delivery