EasyManua.ls Logo

Struers LectroPol-5 - Check Packing List

Struers LectroPol-5
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The equipment is delivered in two boxes.
Control unit
Polishing unit
Polishing unit
1. Cut the packing tape on the top of the box.
2. Remove the loose parts.
3. Remove the unit from the box.
Pump protection
A piece of cardboard with foam protects the pump in the polishing unit during
transport.
1. Press the Up button on the polishing unit to move the polishing table into its
top position.
2. Open the electrolyte compartment cover.
3. Remove the cardboard.
4. Close the electrolyte compartment cover.
5. Press the Down button to carefully lower the polishing table until it is secured in lower
position.
Moving the machine
SeeTransport and storage ►18.
Control unit
See the Instruction Manual for this unit.
5.2 Check the packing list
The equipment is delivered in two boxes:
Control unit
Low-temperature polishing unit
Optional accessories may be included in the packing box.
Low-temperature polishing unit
The packing box contains the following items:
Pcs. Description
1 Low-temperature polishing unit
1 Supply and communications cable for connection to the control unit
5 Installation
LectroPol-5 19

Related product manuals