Preventative Maintenance
7
CHECKLIST
All fasteners secure
Siderails move and latch properly
Engage brake pedal and push on the stretcher to ensure all casters lock securely
Steer function working properly
All casters secure and swivel properly
Body restraints working properly
IV pole intact and operating properly
Oxygen bottle holder intact and operating properly
Fowler operating and latching properly
Knee Gatch operating properly (optional equipment)
Trendelenburg/Reverse Trendelenburg operating properly
No rips or cracks in mattress cover
Ground chain intact
No leaks at hydraulic connections
Hydraulic jacks holding properly
Hydraulic drop rate set properly
Hydraulic oil level sufficient
Lubricate where required
Accessories and mounting hardware in good condition and working properly
No cables worn or pinched (optional scale system)
All electrical connections tight (optional scale system)
All grounds secure to the frame (optional scale system)
Batteries sufficiently charged (optional scale system)
Display housing intact and not damaged (optional scale system)
Display label intact and not damaged (optional scale system)
Load cells intact and not damaged (optional scale system)
Scale calibrated properly. Recalibrate, if necessary (optional scale system)
Serial No. ______________ ______________ ______________
______________ ______________ ______________
Completed By:_________________________________ Date:_____________
NOTE
Preventative maintenance should be performed at a minimum of annually. A preventative maintenance pro-
gram should be established for all Stryker Medical equipment. Preventative maintenance may need to be
performed more frequently based on the usage level of the product.
Return to Table of Contents